WEG
  • WEG Motor Scan
  • Full Monitoring
  • How it works
  • Downloads
  • Contact
  • FAQ
  • Updates
  • VIDEOS
  • Language
    • Deutsch
    • English
    • Español
    • Français
    • Português
    • Русский

Full Monitoring

Developed for electric motors and other equipment, after an easy installation, the WEG Motor Scan must be configured through a smart device (App available for Android and iOS). Once configured, the sensor sends data to the cloud via Bluetooth® or Gateway and enables the analysis of the results in WEG Motion Fleet Management, and in greater depth with the WEG Motor Specialist module.

It makes a complete diagnosis of the equipment's operation by measuring temperature, vibration analysis, running time, load, speed, lubrication interval and can operate with alert levels to assist in predictive maintenance.

 
 

Artificial intelligence for real results

WEG Motor Scan® learns about the operating patterns and deviations that the monitored electric motor presents during its operation, based on unbalance, misalignment, load and consumption indicators, and makes this data available automatically through the Gateway to the WEG Motor Specialist module in WEG Motion Fleet Management. And it is from this learning that the sensor identifies, without human interference, vibration occurrences that change the operating standards of the monitored equipment. Artificial intelligence in favor of reliability, productivity and machine availability.

With WEG Motor Scan you will be able to

  • Connect all the sensors at the plant
  • Synchronize data through WEG IoT Platform
  • Name and monitor as many motors as you need
  • Analyze data sent to the cloud
  • Find your motor everywhere 
  • Get diagnostics

 

Funcionalities

  • Motor frame: 63 to 450

  • Triaxial vibration measurement (up to 3 kHz) in global speed and acceleration values

  • Vibration spectrum

  • Unbalance and misalignment diagnosis.

  • Surface temperature measurement

  • Estimated load, power, speeds and supply frequency (for motors with direct starter or soft-starter)

  • Motor running time measurement

  • Bearing relubrication interval

  • Battery-powered, estimated service life over 3 years (according to the application);

  • Ambient temperature: -40 to 80°C

  • Bluetooth® communication via App and/or Gateway

  • Dimensions: 44 x 38 x 25 mm

  • Protection rating: IP66

  • Direct Starter or Frequency Inverter

  • Data storage capacity: 3 months

  • Certifications: Safety/EMC/Radio for the markets: South Africa, Australia, Brazil, Canada, Chile, Colombia, USA, Europe, Malaysia

 

Product Differentials

  • Increases equipment efficiency

  • Maintenance routine optimization

  • Economy with spare parts replacement

  • Ready for Industry 4.0

  • Add value to the product (OEM’s) 

  • Add value to the service (maintenance companies)

  • Downtime reduction

FAQ

Do you have any doubts about WEG Motor Scan? Check the answers for our Frequently Asked Questions.

I forgot my password. How can I recover?
You'll need to remember the email address used in your account to perform automatic recovery. Just go to https://iot.weg.net and click on the "Forgot your password?" Link.
Enter your email and click on "Send verification code". Open the email with the title similar to "Verification code", copy the received code and paste it into the according field. Click "Verify code" and "Continue," then enter your new password.
I received an email to access a plant. What do I do?
Use this email to access content via the link available or to download the app from one of the available app stores. If you do not already have an account, navigate to https://iot.weg.net and click on "Sign Up" to create an account.
You will already have access to the plant that you were invited when you finish your registration.
How do I install the WEG IoT App?

You can follow one of the links below to be redirected to the app store on your smartphone or tablet.

How does WEG Motor Scan send the measurements to the WEG IoT Platform?
Measurements stored in the WEG Motor Scan must be collected using the WEG Motor Scan mobile app with a smartphone or tablet through the Bluetooth conection. If the smartphone or tablet has an internet connection at the time of collection the data will be transferred automatically. However, data can be collected for later upload according to internet availability.
What happens when I restart WEG Motor Scan?
All sensor configuration will be erased and the WEG Motor Scan can be configured for use on another motor. The data collected and sent to the WEG IoT Platform will remain avaiable in the plant where the sensor was registered.
  • 1
  • 2
  • 3
  • ...
  • 7

Know more about WEG's news about Industry 4.0

Orquídea increases food production with Bônus Motor program

Orquídea increases food production with Bônus Motor program

WEG IoT monitoring implements efficiency solutions for electric motors replaced with the program

WEG equips Jaguar Land Rover's first sustainable electric vehicle charging station in Brazil

WEG equips Jaguar Land Rover's first sustainable electric vehicle charging station in Brazil

A project created through the JLR's Open Innovation program, in partnership with WEG, Energy Source, and EZVolt, integrates solar generation, electric vehicle charging station, and energy storage in lithium batteries

WEG consolidates its business strategy as a global mining player

WEG consolidates its business strategy as a global mining player

Key projects were gained by WEG in the main countries for mining business such as, Canada, Chile, South Africa, and Australia

WECM: a complete and versatile solution for motor fan applications.

WECM: a complete and versatile solution for motor fan applications.

WEG's launch has a built-in drive and IE5 efficiency level, the best performance in the market

WEG supplies equipment for automation of new sugar plant of Caña Brava Sugar And Alcohol Company, in Peru

WEG supplies equipment for automation of new sugar plant of Caña Brava Sugar And Alcohol Company, in Peru

The production operates 100% in the automatic mode, ensuring a fine control and repetition of the batches integrated to the quality control of the plant biochemical lab.

WEG acquires total shares of BirminD

WEG acquires total shares of BirminD

Acquisition is part of the Company's strategy to grow the digital business for industrial optimization solutions

Reliability of the WEG Motor Scan® in the automatic diagnosis of imbalance and misalignment of electric motors

Reliability of the WEG Motor Scan® in the automatic diagnosis of imbalance and misalignment of electric motors

Module WEG Motor Specialist brings more accuracy to the solution

Bioenergy plant counts on WEG services

Bioenergy plant counts on WEG services

Retrofitting and commissioning of equipment are among the services performed

WEG solutions equip some of Brazil's major airports

WEG solutions equip some of Brazil's major airports

Recent investments in terminal expansion, new boarding areas, expansion of runways for new flights, increased service capacity and infrastructure upgrading at some of Brazil's major airports have brought WEG great business opportunities.

WEG Motor Specialist: monitoring with Artificial Intelligence

WEG Motor Specialist: monitoring with Artificial Intelligence

New WEG Motion Fleet Management module improves automatic diagnosis of electric motors

WEG and Neoenergia carry out on-site transformer repair in record time

WEG and Neoenergia carry out on-site transformer repair in record time

Repair services were performed at Termopernambuco power plant with the objective of reducing maintenance required time and ensuring power generation availability.

Coremas Solar Complex is inaugurated in Paraíba, Northeast of Brazil

Coremas Solar Complex is inaugurated in Paraíba, Northeast of Brazil

WEG has been awarded with engineering, procurement and construction for the solar park projects that will result in a generation capacity of 93 MWp.

Ship manufacturers use WEG solutions to improve efficiency

Ship manufacturers use WEG solutions to improve efficiency

WEG solutions for super green marine dredger

Hübner ensures more energy efficiency with WEG

Hübner ensures more energy efficiency with WEG

WEG equipment was installed on the Cooling Tower

WEG takes part of Talara refinery modernization project in Peru

WEG takes part of Talara refinery modernization project in Peru

The refinery intends to increase its production capacity by 30% with this modernization project.

WEG Group - Motors Business Unit
  • Avenida Prefeito Waldemar Grubba, 3300 - 89256-900 - Jaraguá do Sul - SC
  • Phone: +55 47 3276 4000
  • E-mail: motores@weg.net
 
Cookie Preferences
Privacy Notice | Cookie Statement | Terms and Conditions