返回到 我的账户
WEG’s initiatives were intended to meet two of the seventeen UN Sustainable Development Goals. 了解更多
This package of equipment is part of generator sets for several CEMIG’s projects 了解更多
Module WEG Motor Specialist brings more accuracy to the solution 了解更多
Retrofitting and commissioning of equipment are among the services performed 了解更多
With the application of WEG equipment, Oleoplan will be self-sufficient in terms of power generation for its industrial operations. 了解更多
Solutions provided by WEG consist of four complete Energy Storage systems including lithium-ion batteries and flux batteries in different applications, in addition to the development of microgrids control powered by several energy sources. 了解更多
The WEG Motion Fleet Management solution provides asset on-line monitoring to allow the predictive maintenance and TCO reduction 了解更多
Project replaces critical water pump with minimal disruption 了解更多
Wind turbine is part of the project for the first National Wind Turbine, which is intended to develop national technology and production chain for the manufacture and installation of large size equipment in the country 了解更多