返回到 我的账户
The project focused on restoring the asset’s performance and extending the service life of the transformer, which had been operating at the substation for more than 20 years 了解更多
The modernization of the protection, supervision, and control systems at the Itajaí Substation (State of Santa Catarina) marks an important step forward in the digitalization of Brazil’s power transmission infrastructure 了解更多
The execution of this highly complex revitalization is only possible thanks to the work of a specialized in-house engineering team, capable of conducting studies, redesigns, and complete adaptations according to customer requirements 了解更多
The equipment will enable safe isolation switching during maintenance operations. 了解更多
The project reinforces the importance of innovation and the development of efficient solutions that will contribute to clean energy generation in Colombia. 了解更多
Project strengthens service quality, expands demand capacity, and improves reliability for more than 25,000 users in the region, consolidating WEG’s presence in the Utilities segment. 了解更多
The photovoltaic plant will have an installed capacity of 161 MWp (megawatt-peak) 了解更多
The 50 MW plant represents an important step in expanding Brazil's renewable energy matrix 了解更多
Project includes the largest synchronous condensers ever produced by the company and strengthens WEG’s presence in Latin America 了解更多
The event in Paris brought together experts from several countries to share best practices in the development of technological solutions 了解更多