Volver a Mi cuenta
The project was part of the transmission network reinforcement plan authorized by ANEEL and included the complete modernization of the substation infrastructure Conozca más
Los Cabos Project Reinforces WEG’s Capability to Deliver Integrated Solutions for Critical Water Infrastructure Conozca más
Supply of W60 motors marks another milestone for WEG in the Oil & Gas segment Conozca más
Replacement of an outdated production-line unit provides greater reliability, component standardization, and longer service life for the drive system Conozca más
With asset management and online monitoring solutions, a sugar and ethanol plant achieved greater reliability, predictability, and operational efficiency during the harvest season Conozca más
Automation and electric drive solutions ensure efficient operation even in extreme temperatures, reinforcing sustainability and industrial resilience Conozca más
With a current of 80,000 Amperes (A) and an original power rating of 22 MVA, WEG uprated the transformer to 33.4 MVA while also implementing a series of technological upgrades Conozca más
These equipments are especially recommended for installations in residential buildings Conozca más
The project focused on restoring the asset’s performance and extending the service life of the transformer, which had been operating at the substation for more than 20 years Conozca más
Technology now incorporates a hybrid solution that contributes to energy efficiency Conozca más