返回到 我的账户
The company supplied complete generation equipment for the new hydropower project in the country 了解更多
With more than eight years of reliable operation, the Potrero Hydroelectric Power Plant confirms the robustness of WEG’s Water to Wire solution 了解更多
Equipment produced at the Hosur factory will be applied in Francis turbines and will operate synchronized to the grid to reinforce renewable generation 了解更多
The HPP will be capable of generating energy to supply, on average, 110,000 inhabitants 了解更多
The project reinforces the reliability of WEG solutions and consolidates the partnership with Ibemapar 了解更多
By choosing to repair the transformer, the customer will gain in energy efficiency and contribute to the reuse of natural resources 了解更多
WEG supplied two turbines and generators sets for this SHPP located in Paraná, Brazil 了解更多
The energy generated at the Eletrobras Chesf Plant is transmitted through a WEG step-up substation featuring twenty 150MVA transformers each, which elevate the voltage from 18kV to 500kV 了解更多
The company also provided the complete electrical package for the expansion of the Small Hydroelectric Plant 了解更多
The company reinforces its global presence in renewable energy generation projects 了解更多