Back to My Account
With more than eight years of reliable operation, the Potrero Hydroelectric Power Plant confirms the robustness of WEG’s Water to Wire solution Know more
Equipment produced at the Hosur factory will be applied in Francis turbines and will operate synchronized to the grid to reinforce renewable generation Know more
The HPP will be capable of generating energy to supply, on average, 110,000 inhabitants Know more
The project reinforces the reliability of WEG solutions and consolidates the partnership with Ibemapar Know more
By choosing to repair the transformer, the customer will gain in energy efficiency and contribute to the reuse of natural resources Know more
WEG supplied two turbines and generators sets for this SHPP located in Paraná, Brazil Know more
The energy generated at the Eletrobras Chesf Plant is transmitted through a WEG step-up substation featuring twenty 150MVA transformers each, which elevate the voltage from 18kV to 500kV Know more
The company also provided the complete electrical package for the expansion of the Small Hydroelectric Plant Know more
The company reinforces its global presence in renewable energy generation projects Know more
Weighing 285 tons each, WEG generators will be part of a hydropower project in the state of Santa Catarina, in Brazil, with 142 MW installed capacity Know more