Retour à la page d'accueil Mon compte
The solution will be applied to a liquids fractionation system at a facility located on the Gulf of Mexico Coast, with planned operation at the Mont Belvieu energy hub in Texas. En savoir plus
Toyota's restructuring project in Brazil includes the expansion of its existing manufacturing facility in Sorocaba (SP), reaching a total area equivalent to 40 football fields En savoir plus
Forty electric buses from CAIO/Eletra/Mercedes-Benz equipped with WEG traction systems and batteries — as well as WEG charging systems En savoir plus
Project includes the largest synchronous condensers ever produced by the company and strengthens WEG’s presence in Latin America En savoir plus
Medium-Voltage Solutions to Drive Critical Pumping Infrastructure in the Gulf Region En savoir plus
The HPP will be capable of generating energy to supply, on average, 110,000 inhabitants En savoir plus
Solution applied to a key gearbox in the rubber and leather processing machinery production line ensures operational continuity and cost reduction En savoir plus
With smart sensors and monitoring software, the company improves predictive maintenance and ensures water supply for thousands of families En savoir plus
The award strengthens the partnership and highlights WEG as a strategic supplier, recognized for its commitment to quality, innovation, and reliability En savoir plus
L'utilisation des moteurs WEG apportera des améliorations énergétiques significatives au projet. En savoir plus