Back to My Account
The modernization of the protection, supervision, and control systems at the Itajaí Substation (State of Santa Catarina) marks an important step forward in the digitalization of Brazil’s power transmission infrastructure Узнайте больше
The solution enables real-time monitoring of dry-type transformer performance, with the goal of anticipating failures and optimizing asset management Узнайте больше
The three 500 MVA power transformers will play a strategic role in adapting the voltage of a 440 kV transmission line to 525 kV Узнайте больше
Agreement includes full supply of equipment and services for the transmission project between the states of Mato Grosso (MT) and Rondônia (RO) Узнайте больше
The execution of this highly complex revitalization is only possible thanks to the work of a specialized in-house engineering team, capable of conducting studies, redesigns, and complete adaptations according to customer requirements Узнайте больше
The equipment will enable safe isolation switching during maintenance operations. Узнайте больше
Real-time tests validate the reliability of WEG solutions for digital substations, ensuring compliance with ONS requirements. Узнайте больше
The project reinforces the importance of innovation and the development of efficient solutions that will contribute to clean energy generation in Colombia. Узнайте больше
The equipment is responsible for converting grid energy into direct current used in the furnaces, enabling the transformation of raw materials for the steel industry. Узнайте больше
The photovoltaic plant will have an installed capacity of 161 MWp (megawatt-peak) Узнайте больше