WEG was responsible for carrying out the minor overhaul (preventive maintenance or corrective maintenance focused on specific components, without requiring complete equipment disassembly) of Veracel’s turbogenerator, located in Eunápolis/BA, one of the world’s largest pulp producers, during the company’s 2026 general maintenance shutdown. WEG’s involvement in highly complex services for critical equipment reinforces its position as a strategic partner for the pulp and paper industry. 

Performed under rigorous planning and aligned with the highest standards of safety, quality, and performance, the project aimed to ensure maximum reliability of the turbogenerator, an essential piece of equipment for the plant’s energy generation and operational stability. The minor overhaul represents a strategic stage in the equipment life cycle, contributing to increased availability, energy efficiency, and operational lifespan. 

During the execution of the services, WEG mobilized specialized teams and applied proven maintenance methodologies, carrying out comprehensive technical inspections, adjustments, verifications of mechanical and electrical systems, as well as evaluations of the equipment’s operational conditions. The work was conducted with a focus on asset integrity and the safe continuity of the plant’s operations. 

Veracel’s performance also highlights WEG’s capability to deliver integrated solutions for all industrial plant lifecycle phases, ranging from turbines and generators to specialized maintenance and modernization services. The combination of engineering, manufacturing, and services creates a complete approach capable of meeting the reliability and performance demands required by large-scale continuous operations. 

The success of the operation resulted from joint planning and coordinated actions between the organizations involved, including the participation of strategic partners such as Mitsubishi Power, Timenow, Brutus, and Polo. This integration ensured compliance with schedules and technical requirements while reinforcing the culture of safety and excellence that guided all stages of the project. 

WEG has always been at the forefront of technologies, seeking to develop and apply complete solutions for our customers in the pulp and paper segment, while also complementing the supply of turbogenerators for the sector with turbine, generator, and service offerings. This was the case during Veracel’s 2026 shutdown,” stated Marcelo Severi, General Director of WEG Parque Fabril Sertãozinho/SP. 

With the completion of the maintenance, Veracel now has a turbogenerator prepared to operate with even greater stability, safety, and efficiency, reducing operational risks and ensuring higher reliability for its industrial plant. 

More than carrying out a maintenance service, the initiative reinforces WEG’s capability to develop complete technological solutions, combining innovation, experience, and close customer relationships to drive industry competitiveness and sustainability.