Back to My Account
The solutions will provide the necessary infrastructure for the efficient operation of Brazauro Recursos Minerais' Tocantinzinho Project Know more
By choosing to repair the transformer, the customer will gain in energy efficiency and contribute to the reuse of natural resources Know more
The application of WEG solutions will contribute to the supply of drinking water to the population of the Metropolitan Area of the Valley of Mexico (ZMVM) Know more
The design of the bearings has been carefully developed to withstand the high axial thrust of up to 33.2 kN Know more
The contract includes the complete spply of engineering, electromechanical assembly, photovoltaic modules, trackers, inverters, power substation, and connection bay with the local utility, valued at approximately R$ 630 million Know more
W23 Sync+ and W23 Sync+Ultra line receive ATEX/IECEx certification Know more
The wind farm will generate enough clean energy to supply around 679,000 Chilean homes Know more
A 45 MW extraction backpressure steam turbine from WEG will be adding to Sappi Saiccor’s energy generating capacity at its MgO3 plant. The power generated will be used for internal consumption Know more
The project aims to increase the resilience of the city's transmission network, reducing dependence on energy supply from other locations, and meeting demand during the peak tourism season. Know more
The energy generated at the Eletrobras Chesf Plant is transmitted through a WEG step-up substation featuring twenty 150MVA transformers each, which elevate the voltage from 18kV to 500kV Know more