Back to My Account
The company also provided the complete electrical package for the expansion of the Small Hydroelectric Plant Узнайте больше
The company reinforces its global presence in renewable energy generation projects Узнайте больше
Weighing 285 tons each, WEG generators will be part of a hydropower project in the state of Santa Catarina, in Brazil, with 142 MW installed capacity Узнайте больше
Weighing 282 tons, the transformer is intended to step-up the tension for the hydroelectric power plant's generators in the northern region of Brazil. Узнайте больше
In addition to the retrofitting of the Transformer, the scope also provided for the study, supply and installation of 12 high voltage insulators for connection in SF6, in other 04 machines Узнайте больше
Set of turbines and generators supplied, make part of the WEG packages Узнайте больше
Company is responsible for delivering 21 power transformers to generate 100% clean energy Узнайте больше
The project is located in Jaraguá do Sul/SC and will enhance the power supply capacity in the region. Узнайте больше
The GH20 Hydro compact-design Hydrogenerators allow powerhouse optimization and can be supplied with skid turbine fully mounted. Узнайте больше