Back to My Account

WEG
  • English
    • Deutsch
    • Español
    • Português do Brasil
  • Sobre WEG
    • Esto es WEG
    • WEG en Números
    • Historia
    • Directorio
    • Operaciones WEG
    • Innovación Tecnológica
    • Sostenibilidad
    • Nuestro negocio
    • Certificaciones
    • Company Profile
    • Innovación Abierta
  • Productos
  • Solutions
    • WEG efficiency
    • Digital Solutions
    • WEG Motion Drives
    • Generación de energía
    • Energía eólica
    • Energía Térmica
    • Agricultura y Agronegocios
    • Minería
    • Azúcar & Etanol
    • Siderurgia
    • Agua
    • Celulosa y Papel
    • Petróleo & gas
    • Navales
    • Movilidad Eléctrica
    • Alimentos y Bebidas
  • Inversionistas
  • Ética
    • Código de Ética
    • Código de Ética para Proveedores
    • Política de Prevención y Combate contra la Corrupción
    • Aviso de Privacidad
    • Canal de Informes
  • Contáctenos
    • Contáctenos
    • Donde Comprar
    • Asistentes Técnicos
    • Recursos y Herramientas
    • Canal de Informes
    • Press Room
  • News
  • Careers
  • ‍
  • ‍
  • Login
  • English
    • Deutsch
    • Español
    • Português do Brasil
  • Início
  • Patio de Madera
  • Línea de Fibras
  • Secado
  • Caldera
  • Máquina de Papel
  • Suministro de Energía
  • Pinturas
  • Servicios
  • Eficiencia Energética
  1. Home
  2. Pulp & Paper - Boiler

Caldera de Recuperación de Fuerza

WEG dispone de la solución completa para el sistema de generación de energía, productos desarrollados con alto estándar de calidad y tecnología exigidas mundialmente. Cuenta, también, con un equipo de ingenieros y especialistas en generación y sistemas eléctricos a disposición para auxiliarlo con la solución técnica más eficiente.

Learn more about WEG news on Pulp & Paper

Suministro para el proyecto Puma II refuerza la alianza entre WEG, Valmet y Klabin

Suministro para el proyecto Puma II refuerza la alianza entre WEG, Valmet y Klabin

Inversiones en grandes proyectos impulsan el crecimiento del sector de pulpa y papel en Brasil

WEG impulsa el Proyecto Sucuriú, la primera fábrica de celulosa blanqueada de Arauco en Brasil

WEG impulsa el Proyecto Sucuriú, la primera fábrica de celulosa blanqueada de Arauco en Brasil

Soluciones tecnológicas de WEG refuerzan la eficiencia, confiabilidad y sostenibilidad en el sector de celulosa

WEG aplica tecnología de papel híbrido a transformadores mediante proyecto de I+D

WEG aplica tecnología de papel híbrido a transformadores mediante proyecto de I+D

La tecnología de papel híbrida debería prolongar la vida útil de los transformadores

WEG suministra turbina de vapor para autogeneración en Sudáfrica

WEG suministra turbina de vapor para autogeneración en Sudáfrica

La turbina de vapor de contrapresión de WEG aumentará la capacidad de generación de energía en la planta de Sappi Saiccor

WEG Portugal supplies 28 motors for DS SMITH's innovation and renovation project

WEG Portugal supplies 28 motors for DS SMITH's innovation and renovation project

The motors were manufactured at WEG facilities in Portugal.

WEG solutions equip machines in a cardboard tubes manufacturer

WEG solutions equip machines in a cardboard tubes manufacturer

Through a customized system, the customer has already achieved an efficiency increase of more than 6% in just a few months

WEG supplies a large package of solutions for Bracell's expansion in Brazil

WEG supplies a large package of solutions for Bracell's expansion in Brazil

The scope of the supply included electric motors, electrical panels, transformers and variable frequency drives, totaling more than 6,300 items delivered

WEG supplies electrical package for Suzano's new factory

WEG supplies electrical package for Suzano's new factory

The scope of supply involves more than 3,000 items, including: distribution transformers, high-efficiency motors, electrical panels and drives

WEG supplies R$140 million electrical package for Klabin's expansion in Paraná, Brazil

WEG supplies R$140 million electrical package for Klabin's expansion in Paraná, Brazil

Puma II Project is part of the company's new investment cycle and will place 910,000 tons of paper annually on the market

WEG supplies turn-key solutions to WestRock

WEG supplies turn-key solutions to WestRock

The solution package included turbogenerators, e-houses, MCC's, frequency inverters, electric motors and dry type transformers.

WEG supplies permanent magnet motor to Klabin

WEG supplies permanent magnet motor to Klabin

W22 Magnet brings more productivity for the production of paper and pulp

Cia Canoinhas boosts production with WEG equipment

Cia Canoinhas boosts production with WEG equipment

Tissue paper machinery fitted with W22 IR3 Premium and W50 electric motors

Implementing upgrades to reduce maintenance costs and increase production capacity

Implementing upgrades to reduce maintenance costs and increase production capacity

Author: Keith Kloiber, Paper Industry Manager, WEG

Canoinhas Company and WEG together in the  ANEEL/Celesc Energy Efficiency Program

Canoinhas Company and WEG together in the ANEEL/Celesc Energy Efficiency Program

Industry saves energy with high efficiency motors

Interessieren Sie sich für eine unserer Lösungen? Finden Sie mit untenstehenden Optionen das Produkt Ihrer Wahl.

Kontaktieren Sie uns und stellen Sie Ihre Fragen

Kontaktieren Sie uns
WEG S.A.
About WEG
  • This is WEG
  • WEG in Numbers
  • History
  • Management
  • WEG Operations
  • Technological Innovation
  • Sustainability
  • Our Business
  • Certifications
Products
  • Electric Motors
  • Generation,Transmission and Distribution
  • Drives
  • Controls
  • Industrial Automation
  • Electric Panels
  • Coatings and Varnishes
  • Spare Parts
Solutions
  • Oil & Gas
  • Marine
  • Steel Industry
  • Water
  • Energy Efficiency
  • Energy
  • Farming & Agriculture
  • Sugar & Ethanol
  • Mining
  • Pulp & Paper
  • Electric Vehicles
Contact
  • Contact Us
  • Where to Buy
  • Service Network
  • Violation of the Code of Ethics
Download Center
  • CAD Library - Electric Motors (2D/3D drawings)
  • CAD Library - Automation (2D/3D drawings)

Do you need other materials? Visit our download center below.

Cookie-Einstellungen
Privacy Notice | Cookie Statement | Terms of Use | RSS | © 2026 WEG. All rights reserved.