Back to My Account
The equipment will enable safe isolation switching during maintenance operations. Know more
Real-time tests validate the reliability of WEG solutions for digital substations, ensuring compliance with ONS requirements. Know more
The project reinforces the importance of innovation and the development of efficient solutions that will contribute to clean energy generation in Colombia. Know more
The equipment is responsible for converting grid energy into direct current used in the furnaces, enabling the transformation of raw materials for the steel industry. Know more
A solução garante maior agilidade, segurança e eficiência em todas as etapas do projeto, proporcionando praticidade e confiabilidade a Companhia Energética de Minas Gerais (CEMIG). Know more
The photovoltaic plant will have an installed capacity of 161 MWp (megawatt-peak) Know more
W60 Motors, frequency inverters, and transformers will be used in a large-scale pumping system in Ras Al-Khair Know more
Através de tecnologias avançadas e em conformidade com as normas técnicas do setor, a WEG contribuirá com a segurança, confiabilidade e eficiência energética do empreendimento. Know more
Project includes the largest synchronous condensers ever produced by the company and strengthens WEG’s presence in Latin America Know more
The installation of the new transformer will provide an advanced technological solution to meet the growing demand of the electrical sector in the region. Know more