Retour à la page d’accueil Mon compte
The company supplied complete generation equipment for the new hydropower project in the country En savoir plus
With more than eight years of reliable operation, the Potrero Hydroelectric Power Plant confirms the robustness of WEG’s Water to Wire solution En savoir plus
Equipment produced at the Hosur factory will be applied in Francis turbines and will operate synchronized to the grid to reinforce renewable generation En savoir plus
The HPP will be capable of generating energy to supply, on average, 110,000 inhabitants En savoir plus
The project reinforces the reliability of WEG solutions and consolidates the partnership with Ibemapar En savoir plus
By choosing to repair the transformer, the customer will gain in energy efficiency and contribute to the reuse of natural resources En savoir plus
WEG supplied two turbines and generators sets for this SHPP located in Paraná, Brazil En savoir plus
The energy generated at the Eletrobras Chesf Plant is transmitted through a WEG step-up substation featuring twenty 150MVA transformers each, which elevate the voltage from 18kV to 500kV En savoir plus
The company also provided the complete electrical package for the expansion of the Small Hydroelectric Plant En savoir plus
The company reinforces its global presence in renewable energy generation projects En savoir plus