Zurück zu Mein Konto
The project focused on restoring the asset’s performance and extending the service life of the transformer, which had been operating at the substation for more than 20 years Erfahren Sie mehr
The modernization of the protection, supervision, and control systems at the Itajaí Substation (State of Santa Catarina) marks an important step forward in the digitalization of Brazil’s power transmission infrastructure Erfahren Sie mehr
The solution enables real-time monitoring of dry-type transformer performance, with the goal of anticipating failures and optimizing asset management Erfahren Sie mehr
The three 500 MVA power transformers will play a strategic role in adapting the voltage of a 440 kV transmission line to 525 kV Erfahren Sie mehr
Agreement includes full supply of equipment and services for the transmission project between the states of Mato Grosso (MT) and Rondônia (RO) Erfahren Sie mehr
The execution of this highly complex revitalization is only possible thanks to the work of a specialized in-house engineering team, capable of conducting studies, redesigns, and complete adaptations according to customer requirements Erfahren Sie mehr
The equipment will enable safe isolation switching during maintenance operations. Erfahren Sie mehr
Real-time tests validate the reliability of WEG solutions for digital substations, ensuring compliance with ONS requirements. Erfahren Sie mehr
The project reinforces the importance of innovation and the development of efficient solutions that will contribute to clean energy generation in Colombia. Erfahren Sie mehr
The equipment is responsible for converting grid energy into direct current used in the furnaces, enabling the transformation of raw materials for the steel industry. Erfahren Sie mehr