Zurück zu Mein Konto
Mega project will generate clean energy to the state of Roraima with less dependability on diesel-operated thermal plants in the region. Erfahren Sie mehr
Disconnectors supplied by WEG ensure safety and maintenance to electric circuits Erfahren Sie mehr
The supply package includes 18 substations to be delivered to the company by 2022 Erfahren Sie mehr
The energy produced will be connected to the electricity grid of the Federal Electricity Commission (CFE), Mexico’s state-owned electric utility. Erfahren Sie mehr
Telemetry technology supplied by the WEG Group company V2COM reduced significantly technical and non-technical losses on the power supply grid. Erfahren Sie mehr
In addition to the retrofitting of the Transformer, the scope also provided for the study, supply and installation of 12 high voltage insulators for connection in SF6, in other 04 machines Erfahren Sie mehr
The new equipment uses the same amount of steam for additional generation of 3.0 MW / h Erfahren Sie mehr
The WEG Science and Technology Museum was upgraded with the installation of a photovoltaic system capable of supplying 70% of the electricity consumed by the building! Erfahren Sie mehr
WEG has been awarded with engineering, procurement and construction for the solar park projects that will result in a generation capacity of 93 MWp. Erfahren Sie mehr
Located in the state of Mato Grosso, Brazil, the plant will have the capacity to produce 225 million liters of ethanol per harvest. Erfahren Sie mehr
Cookie Disclaimer
This site uses cookies in order to improve your online experience. Detailed information on the use of cookies on this website is provided in our Privacy Notice. By continuing to browse the site you are agreeing to our use of cookies.