Zurück zu Mein Konto
WEG supplied two turbines and generators sets for this SHPP located in Paraná, Brazil Erfahren Sie mehr
The energy generated at the Eletrobras Chesf Plant is transmitted through a WEG step-up substation featuring twenty 150MVA transformers each, which elevate the voltage from 18kV to 500kV Erfahren Sie mehr
The company also provided the complete electrical package for the expansion of the Small Hydroelectric Plant Erfahren Sie mehr
The company reinforces its global presence in renewable energy generation projects Erfahren Sie mehr
Weighing 285 tons each, WEG generators will be part of a hydropower project in the state of Santa Catarina, in Brazil, with 142 MW installed capacity Erfahren Sie mehr
Weighing 282 tons, the transformer is intended to step-up the tension for the hydroelectric power plant's generators in the northern region of Brazil. Erfahren Sie mehr
In addition to the retrofitting of the Transformer, the scope also provided for the study, supply and installation of 12 high voltage insulators for connection in SF6, in other 04 machines Erfahren Sie mehr
Set of turbines and generators supplied, make part of the WEG packages Erfahren Sie mehr
Company is responsible for delivering 21 power transformers to generate 100% clean energy Erfahren Sie mehr
The project is located in Jaraguá do Sul/SC and will enhance the power supply capacity in the region. Erfahren Sie mehr