Designed to meet global quality and technology requirements, WEG generators, transformers, panels and cubicles are the preferred choice of Power and Utility Companies thanks to their high efficiency durability.
WEG transformers first machines in the world to undergo real VFT - Very Fast Transient testing. TR 256 MVA/550kV 60 Hz and TR 275 MVA/550kV 50 Hz: the largest step-up power transformers ever made by WEG.
The Fortescue Metals Group’s Cloudbreak mine site and Herb Elliot Port in Port Hedland, Western Australia is almost completed. 24 WEG motors are installed at the mine and the port facilities.
The largest medium voltage inverter ever manufactured by WEG is on its way to the US. The 8000-HP MVW-01 950A will control a 7500-HP WEG motor driving mud drilling pumps at the test laboratory of Weir Pumps, in Dallas, Texas.